Roof Upgrades for Village School Site
Issuance Date: March 24th 2023
Site Location: 3411 Willamette St, Eugene OR 97405
Visits: Contractors are welcome to arrange visits to our site after April 2nd. Please call ahead of time at 541 345-7285 or email apeara@eugenevillageschool.org.
Proposal Due Date &Time: April 21st, 6:00pm: (if you need extra time, please let us know).
The Village School Foundation is accepting bids on upgrading the roofing on (5) buildings for our site.
General Specifications
Prep inclined decks for retrofit.
Install a 1/2" FanFold EPS cover board.
Install a TPO 60 mil mechanically fastened roof system.
Flash all walls, curbs, pipes and vents with new TPO flashings.
Clean jobsite.
Start work after June 16 2023
Complete work before September 5th 2023

The (5) sand colored roof sections are the areas to be upgraded.
The work is to be done for our building owner, the Village School Foundation, so this is not a public entity bid, and does not require prevailing wage.